← All routes

Rail Corridor (Hillview)

5.0 km · out and back · central

SKIP – not a good time for this run

central: PM2.5 152 µg/m³ · PSI 194

NEA reading as of 1:00 pm

Showing the start point. The full 5K route line is coming soon.

Navigate (Google Maps)Navigate (Apple Maps)

How to run it

Join the Rail Corridor and run south toward the old Bukit Timah Railway Station, turn at 2.5 km.

Start / finish
Hillview MRT
Nearest MRT
Hillview (DTL)
Shade
Well shaded
Water points
Not checked yet
Toilets
Not checked yet
Lit at night
Not checked yet

Shaded green corridor. Mostly compacted gravel. Not lit at night.

Draft route: distance and details not yet verified on foot.